Gas Safe registered engineers
Boiler Installation in Teesside and the North East
Your new boiler, sized for your home and fitted properly, usually in a single day.
Free, no-obligation quote
Get Your Free Quote Today
Tell us a little about your home or business. We will arrange a free survey and give you one fixed, written price, with no obligation.
- Free home survey
- Fixed written price
- Installed by our own engineers
What’s included
What a Professional Boiler Installation Includes
A good installation is much more than swapping a box on the wall. Tap each number to see what our engineers do, and why it matters for safety, efficiency and your warranty.

01
Gas supply
We check the gas pipe is the right size for the new boiler and upgrade it if needed, then test the whole installation for tightness.
02
Flue
The flue is fitted to the manufacturer’s instructions and the Building Regulations, with the right clearances from windows, doors and boundaries.
03
Magnetic filter
A magnetic system filter catches sludge and debris before it reaches the boiler, protecting it and your warranty.
04
System cleanse
Your radiators and pipes are cleaned (chemical flush or power flush) and protected with inhibitor, as BS 7593 and manufacturers require.
05
Condensate pipe
The condensate pipe is run and insulated correctly so it does not freeze in winter, one of the most common causes of breakdowns.
06
Controls
Time and temperature controls are fitted with every boiler. Combi boilers in England also get one extra energy-saving control, such as a smart thermostat.
07
Commissioning
We test, set up and record everything on the Benchmark checklist, register your warranty and notify Building Control.
Every kind of installation
Which Boiler Installation Do You Need?
Choose the job that sounds like yours to see what is involved and how long it usually takes.
Like-for-like replacement
Your new boiler goes where the old one was, on the same fuel and type (for example combi to combi). It is the quickest and usually the lowest-cost installation.
- Old boiler drained down, removed and recycled
- New boiler, flue and magnetic filter fitted
- System cleansed and inhibitor added
- Controls fitted, tested and explained
Typical time on site
1 day
Confirmed in your written quote after the free survey.
Combi conversion
Swapping a system or regular boiler for a combi frees up space: the hot water cylinder and loft tanks come out, and hot water comes straight from the boiler, on demand.
- Cylinder, loft tanks and old pipework removed and capped
- Water pressure and flow rate checked first (a combi needs good mains flow)
- Pipework re-routed for mains hot water
- Full system power flush recommended
Typical time on site
1–2 days
Confirmed in your written quote after the free survey.
Boiler relocation
Want the boiler out of the kitchen or into the loft or garage? We plan the new position for the flue, condensate and gas supply before any work starts.
- New flue position checked against the regulations
- Gas, water and condensate pipes extended
- Old position made good and capped
- Loft installs get boarding, lighting and a ladder for safe access
Typical time on site
1–2 days
Confirmed in your written quote after the free survey.
Back boiler removal
Old back boilers sit behind a fireplace and are very inefficient. We remove the boiler and its tanks and fit a modern wall-mounted boiler.
- Back boiler, fire front and cylinder removed
- Fireplace opening made safe
- New boiler and pipework installed
- Radiators flushed and balanced
Typical time on site
2–3 days
Confirmed in your written quote after the free survey.
First-time central heating
For homes without central heating, we design the whole system: boiler, radiators sized for each room, pipework and controls.
- Heat loss check room by room
- Radiators sized and positioned
- Pipework installed with minimum disruption
- Smart controls and thermostatic radiator valves
Typical time on site
3–5 days
Confirmed in your written quote after the free survey.
On the day
Your Installation Day, Hour by Hour
Most like-for-like replacements are finished in a single day. Scroll through a typical day to see what happens and when. Bigger jobs, like conversions or relocations, take a day or two longer.
08:00
A typical like-for-like installation- 08:00
Arrive and protect your home
We introduce ourselves, agree the plan and lay dust sheets and floor protection.
- 08:30
Drain down and remove
The system is drained, the old boiler is isolated, removed and taken away for recycling.
- 10:00
Fit the new boiler and flue
The bracket, boiler and flue go up, level and sealed, in the agreed position.
- 12:00
Connect gas, water and condensate
Pipework is connected and the condensate pipe is run and insulated.
- 13:30
Cleanse the system
Radiators and pipes are flushed, the magnetic filter is fitted and inhibitor is added.
- 15:00
Commission and test
Gas tightness test, flue gas analysis and pressure checks, recorded on the Benchmark checklist.
- 16:00
Set up and hand over
Controls are set up, we show you how everything works and leave your home tidy.
Choosing a boiler
Combi, System or Regular?
The right type depends on how many bathrooms you have, your water pressure and your space. We recommend the right one at your survey.
Ideal Vogue Max CombiHot water on demand
Combi boiler
Heating and hot water straight from the mains, with no tanks or cylinder.
Small to medium homes1 bathroomSaves space
Ideal Logic SystemStored hot water
System boiler
Heats a sealed hot water cylinder, so several taps can run at once.
Larger homes2 or more bathroomsWorks with solar
Ideal Logic+ HeatTank-fed system
Regular (heat only)
Uses a cylinder and loft tanks. Ideal where older pipework or low mains pressure suits it.
Older systemsLow water pressureKeeps existing tanks
Done properly
Regulations, Certificates and Paperwork
A safe, legal installation comes with paperwork. Here is everything you receive from us, when you get it, and what it means.
Your handover pack
Everything in writing
- Gas Safe registered engineer
- Building Regulations certificate
- Benchmark commissioning checklist
- Boiler Plus controls (England)
- Manufacturer warranty registered
- System cleanse and inhibitor record
✓ Safe, legal and warranty-ready
Before work starts
Gas Safe registered engineer
All gas work must, by law, be done by a Gas Safe registered engineer. Ask to see the ID card; our engineers carry theirs on every visit.
Within 30 days
Building Regulations certificate
We notify Building Control through the Gas Safe Competent Person Scheme. Your compliance certificate follows, usually within 30 days.
On the day
Benchmark commissioning checklist
The industry checklist recording the tests and settings on the day. Manufacturers need it for your warranty.
On the day
Boiler Plus controls (England)
Every new gas boiler gets time and temperature controls. New combis also need one extra measure, such as a smart thermostat or weather compensation.
After registration
Manufacturer warranty registered
We register your boiler with the manufacturer, so your guarantee starts straight away. The length depends on the boiler and is confirmed in your quote.
On the day
System cleanse and inhibitor record
Your system is cleaned and protected to BS 7593, and we record what was done, as most warranties require it.
Your price
What Affects the Cost of a Boiler Installation?
Every home is different, so we do not guess. After a free survey you get one fixed, written price that includes everything listed in it: no hidden extras on the day.
- Free home survey
- Fixed written quote
- Old boiler removed and recycled
- Boiler type and outputCombi, system or regular, and the size your home needs.
- Type of jobA like-for-like swap costs less than a conversion or relocation.
- Flue and positionA new flue route, a vertical flue or a loft position adds work.
- System cleanseA chemical flush or a full power flush, depending on your system.
- ControlsFrom a simple programmer to a smart thermostat with weather compensation.
- Gas pipe upgradeNeeded if the existing pipe is too small for the new boiler.
Bars show how much each factor typically affects the price.
Questions
Boiler Installation FAQs
How long does a boiler installation take?
A like-for-like boiler replacement usually takes one day. Converting to a combi or moving the boiler usually takes one to two days, removing a back boiler two to three days, and a full new central heating system three to five days. Your quote confirms the time for your job.
Will I be without heating and hot water?
Only while the work is being done. On a one-day installation your heating and hot water are back on by the end of the day.
Do I need to be at home?
Someone over 18 needs to be there at the start, to agree the plan, and at the end, so we can show you how the boiler and controls work.
Can you move my boiler to a different room?
Usually, yes. We check the new position at the survey for the flue, condensate drain and gas supply, and include everything in your fixed price.
Do I need a power flush?
Most manufacturers require the system to be cleaned before a new boiler is fitted. We recommend a chemical flush or a power flush depending on the condition of your radiators and pipework.
What is Boiler Plus?
Rules in England for new gas boilers: they must be at least 92% efficient and come with time and temperature controls. New combi boilers also need one extra energy-saving measure, such as a smart thermostat, weather compensation, load compensation or flue gas heat recovery.
What paperwork will I receive?
The completed Benchmark checklist, your manufacturer warranty registration, and a Building Regulations compliance certificate (sent through the Gas Safe scheme, usually within 30 days).
